防水涂料施工工艺
防水涂料施工工艺
Construction Technology of Waterproof Coatings
施工顺序:基层处理 涂刷底层涂料 涂布第一道涂膜防水层 涂布面涂膜防水层 质量检查验收合格 进行下道工序卷材施工。
Construction sequence: Base treatment, brushing the bottom coating,
coating the first film waterproof layer, coating the surface waterproof
layer quality inspection and acceptance of qualified coil construction
in the next process.
施工前应检查,基层要坚实具有一定强度,表面无浮土砂粒等污染物。基层应干燥,含水率应少于9%为宜。
Before construction, it should be checked that the base should be firm
and have a certain strength, and the surface should be free of
pollutants such as floating soil and sand grains. The base should be dry
and the moisture content should be less than 9%.
涂布顺序应先垂直面,后水平面,先阴阳角及细部后大面每层涂布方向应顺直。
The coating sequence should be vertical first, then horizontal. The
direction of each coating layer should be straight from the Yin-Yang
angle and the detail to the large surface