联系我们

电话:13313028229

新闻动态
阳台防水施工
阳台防水施工
Balcony waterproofing construction
施工程序:验收找平层®清理基层®配置水泥粘合剂®做附加层®基层施工®保护层®养护
Construction procedures: acceptance leveling layer & reg; cleaning base & reg; configuring cement binder & reg; making additional layer & reg; base construction & reg; protective layer & reg; maintenance
粘结前,先将卷材预铺开,找正,然后将卷材两端对折卷起,把配置好的水泥粘合剂倒入基层上,并用刮板均匀的刮开,再将卷材向前推铺,并及时用刮板排除遗留
Before bonding, the coil is pre-laid and aligned, then the ends of the coil are folded and rolled up, the cement binder is poured into the base, and scraped evenly with the scraper, then the coil is pushed forward, and the scraper is used to remove the remaining materials in time.
在卷材内部的空气,刮出多余粘合剂。卷材与找平层的粘合率³85%。
Scrape out excess adhesives in the air inside the coil. The adhesive ratio of coil and leveling layer is sup3; 85%.
接缝做法:(1) 屋面防水接缝施工:隔气层、防水层和附加层均采用搭接缝方法。用水泥粘合
Joint method: (1) roof waterproof joint construction: air-proof layer, waterproof layer and additional layer all adopt lap joint method. Adhesion with cement
剂粘结。宽度10cm。附加层接缝与防水层接缝错开5cm以上。
Adhesive bonding. The width is 10 cm. The joint between the additional layer and the waterproof layer is staggered for more than 5 cm.
(2) 地下室防水接缝施工:采用10-15cm搭接盖条接缝方式,盖条选用高分子合缝
(2) Basement waterproof joint construction: 10-15cm overlap cover joint mode and polymer joint for cover strip
粘合胶粘结。
Adhesive bonding.
(3) 防水卷材搭接宽度长边8-10cm,短边10-15cm,相邻短边接缝应错开100cm以
(3) The lap width of waterproofing membrane is 8-10 cm on the long side and 10-15 cm on the short side. The adjacent short side joints should be staggered by 100 cm.
上,墙面与地面夹角处均为30cm以上。
The angle between the wall and the ground is above 30 cm.

联系方式

  1. 电话:13313028229

版权 © 还含遵化,迁安,滦州,迁西,滦南,乐亭,玉田等   网址:tsfangshui.75ix.com  推荐:唐山防水施工,唐山防水材料,唐山市做防水工程

友链:标志桩模具 不锈钢铸件 河北锻造厂 电缆夹 淤泥固化设备 网站建设及优化保定遨游网络公司