防水涂料施工工艺 |
防水涂料施工工艺 Construction Technology of Waterproof Coatings 施工顺序:基层处理 涂刷底层涂料 涂布第一道涂膜防水层 涂布面涂膜防水层 质量检查验收合格 进行下道工序卷材施工。 Construction sequence: Base treatment, brushing the bottom coating, coating the first film waterproof layer, coating the surface waterproof layer quality inspection and acceptance of qualified coil construction in the next process. 施工前应检查,基层要坚实具有一定强度,表面无浮土砂粒等污染物。基层应干燥,含水率应少于9%为宜。 Before construction, it should be checked that the base should be firm and have a certain strength, and the surface should be free of pollutants such as floating soil and sand grains. The base should be dry and the moisture content should be less than 9%. 涂布顺序应先垂直面,后水平面,先阴阳角及细部后大面每层涂布方向应顺直。 The coating sequence should be vertical first, then horizontal. The direction of each coating layer should be straight from the Yin-Yang angle and the detail to the large surface |
上一页 防水应用 |
下一页 地下防水工程施工做法 |
Copyright © 技术支持:遨游网络